Consultation Results

All statemens prepared within the ESK and its committees on Waste Conditioning, Transport and Interim Storage (AZ), Final Disposal (EL) and Decommissioning (ST) can be found here.

With the filter "Published by" you can select whose consultation results you would like to see. Statements prepared within the RSK Committee on FUEL SUPPLY AND WASTE MANAGEMENT (VE) will be shown with the filter criteria "RSK", the ones of the ESK/SSK Ad Hoc Working Group Asse with the filter criteria "Ad-hoc-AG ASSE".

 

21.02.2019 STATEMENT Safety concept requirements for the barrier system of a repository for high-level radioactive waste and their implementability
12.12.2018 LETTER/ANNEX Letter from the ESK Chairman concerning the online consultation on the BfE's research strategy and agenda
06.12.2018 RECOMMENDATION Guideline on the protection of disposal facilities against flooding
07.09.2018 STATEMENT Implementation of the ESK guidelines for the storage of radioactive waste with negligible heat generation
26.07.2018 STATEMENT Safety-related and logistical requirements for a central reception storage facility for the Konrad repository
26.07.2018 RECOMMENDATION Requirements for operating reports of ongoing decommissioning projects
16.07.2018 INFORMATION PAPER Clearance of radioactive material and removal of non-radioactive material from the dismantling of nuclear power plants (full version)
07.06.2018 INFORMATION PAPER Clearance of radioactive material and removal of non-radioactive material from the dismantling of nuclear power plants (summary)
01.03.2018 RECOMMENDATION Harmonisation of reporting criteria for incidents involving radioactive waste with negligible heat generation
01.03.2018 RECOMMENDATION Annex 1 to the recommendation of the Nuclear Waste Management Commission of 1 March 2018
01.03.2018 RECOMMENDATION Explanatory notes concerning Annex 1 to the ESK recommendation of 1 March 2018
01.03.2018 RECOMMENDATION Annex 2 to the ESK recommendation of 1 March 2018

Note:

Annex 2 was subsequently adopted at the 65th meeting of the Nuclear Waste Management Commission on 19.04.2018.

01.03.2018 RECOMMENDATION Annex 3 to the ESK recommendation of 1 March 2018

Note:

Annex 3 was subsequently adopted at the 65th meeting of the Nuclear Waste Management Commission on 19.04.2018.

21.09.2017 MEMORANDUM Maintaining competence in the field of radioactive waste management
16.03.2017 QUESTIONNAIRE Implementation of the ESK guidelines for the storage of radioactive waste with negligible heat generation (rev. vers. 16.3.17)
25.01.2017 GUIDANCE Main topics of interest to the Committee on DECOMMISSIONING when requesting information about future decommissioning projects
27.10.2016 STATEMENT Decommissioning and dismantling of the Isar 1 nuclear power plant (KKI 1)
12.05.2016 STATEMENT
(available in German only)
Waste disposal research in Germany: Comments on content of research and research steering
12.05.2016 DISCUSSION PAPER Discussion paper on the disposal of heat-generating radioactive waste, depleted uranium from uranium enrichment, waste to be retrieved from the Asse II mine and other waste that cannot be emplaced in the Konrad repository at one site
17.03.2016 RECOMMENDATION Requirements for packages for the disposal of heat generating radioactive waste (editorially revised version of 20.01.2017)